Appointed to deliver Employer’s Agent and CDM Principal Designer services in support of the modernisation of Clarson House’s communal heating system, improving reliability, efficiency, and long-term performance for the client and their residents.
The client
Wandle Housing Association was formed in 1967 by a group of local people who were concerned about homelessness. They see their purpose as supporting people across south London who need a home and helping to tackle the shortage of good-quality affordable housing. They have over 7,000 homes across nine south London boroughs, providing homes for rent (social and affordable), shared ownership, outright sale, and supported housing.
The project
The project encompassed the renewal of the existing heating infrastructure throughout the building, the upgrade of the existing energy centre, replacement of the district heating pipework, replacement of Heat Interface Units (HIUs) and underfloor heating controls to all 103 properties (89 apartments and 14 townhouses), and associated internal works, including replacement ceilings throughout the building. This project sought to modernise the building’s communal heating system, improving reliability, efficiency, and long-term performance for the client and their residents.
Our role
FFT was appointed by Wandle Housing Association to deliver Employer’s Agent and CDM Principal Designer services in support of the project, including Mechanical & Electrical Site Inspector services.
As part of our Employer’s Agent role, we administered the contract, monitored progress, quality, and cost, chaired project meetings, and ensured that the works were delivered in accordance with the client’s requirements.
Regular progress reports were prepared and issued to report on, for example, progress, programme, access issues, risks and cost. The initial programme was exceeded, resulting in Extension of Time applications from the contractor, which we reviewed and then deemed that an Extension of Time was permitted under the JCT Design & Build (D&B) 2024 contract with the client’s amendments.
For our CDM Principal Designer role, we assisted the client in ensuring they complied with their duties and responsibilities under the Construction (Design & Management) Regulations 2015 (CDM), collated and prepared the Pre-Construction Information, and collated information for the Health & Safety File prior to completion and handover.
Our Mechanical & Electrical Site Inspector role included regular visits and surveys to ensure that works on site were carried out to design, the client’s requirements, regulatory requirements and as per the programme.
Reports were prepared and issued. All issues identified were recorded by written and photographic means, along with a tracker to check that items were being tracked, recorded and resolved prior to handover.
Services provided
The challenges
Working in an existing building and individual apartments presented its challenges. In conjunction with the client and wider project team, we assisted with working through an access strategy to obtain access to all apartments. Access was obtained to all 103 properties, thus providing a 100% success rate – a fantastic result and legacy for Wandle Housing Association, their residents, and the whole project team.
We identified that the existing firestopping needed upgrading and replacing. Working with the client, we facilitated discussions and meetings with the wider project team and the client’s own fire consultant. Remedial works were arranged to ensure that the fire strategy was up to date and effective firestopping was in place.
The project was delivered within a restricted site with limited access, requiring careful planning and coordination. Works were undertaken in an occupied residential development, making it essential to minimise disruption, maintain resident safety and ensure continuity of heating services.
Added value
We assisted the client in resolving fire-related matters and issues with the existing building, which were not known until work had commenced on site, with a view to enabling progress on site to continue and to avoid/mitigate any delays to the programme.
We facilitated a ‘Lessons Learnt’ exercise to assist the client in any future or similar schemes they undertake, reviewing where lessons can be learnt, what worked well, and where improvements can be made.
The outcome
This successful project achieved the following:
- Replacement of the existing heating infrastructure with new insulated pipework, complete with leak detection for the external underground pipework.
- Replacement of all 103 HIUs to individual properties – a 100% success rate.
- Replacement of underfloor heating manifolds and associated components to all individual properties to futureproof the installations.
- Remedial works to upgrade the existing firestopping between residential and non-residential (i.e., communal) areas.
And brings with it several benefits to Wandle Housing Association and their residents including:
- A reduction in the internal temperatures within communal corridors owing to the improved insulation to new pipework and new ceilings, thus improving the internal environment.
- Improved efficiencies of the heating and hot water systems.
- Futureproofing of the heating infrastructure, individual HIUs, and associated underfloor heating components.
- Greater control over internal temperatures (for residents) inside individual apartments and townhouses and potential reduction in energy usage and bills.
The legacy of this project is that all residents at Clarson House will benefit from the above for many years to come.